68th Street Closure Notice
Fireside Flat neighbors! 68th St will be closed September 20th and 21st for two huge milestones! On September 20th we're having our first...
Gas, but the good kind.
It's been a minute since our neighborhood update! Which probably means we've been trucking along with no hiccups and everyone is excited...
68th Street Closures
Hi Neighbors! First...Compass would like to apologize for not hitting the button "Publish" on prior blog posts; these posts were...
Snow Plowing Drone
Who is excited about some snow?! Is anyone getting ready to shred the gnar and ride on the pillowy pillows of snow up at Sno-Crummy-Pass?...
Tower Crane Erection
As mentioned in our blog update last week, the construction site, named Fireside Flats, located on 841 NE 68th Street, Seattle, WA 98115...
Shoring Complete! Next Up - Concrete!
The site has completed installing all soldier piles! As you probably saw, there was a drill rig on our site that drilled the piles into...
Demolition Complete & Shoring Commencement
The demolition and clearing of (4) existing homes is complete! Now, we're onto mass excavation and shoring! Mass excavation started...
Replacing Asphalt Driveway on January 14th and 15th - Expect alley closure
Asphalt pavement replacement is tentatively scheduled for the 14th and 15th of January 2020. Remove of existing asphalt pavement surface...
Tower Crane Dismantle on May 4th – Expect periodic street closures
Stream Dexios' tower crane will be dismantled on Saturday 5/4/19. The crew will be on site at about 5 AM. TRAFFIC: During the dismantle,...