top of page

Tower Crane Erection: Traffic Control Plan for Monday (7/16)

The tower crane erection is scheduled for Monday (7/16) followed by load testing on Tuesday (7/17).

The erection activities will be utilizing only one lane of the 165th street from 7AM (PST) to 7PM (PST), while the other lane will remain open for traffic. There will be two traffic controllers present on 165th during this time period.

Traffic Control Plan

As depicted above, various traffic signs will be erected to facilitate a smooth traffic flow from & around the jobsite.

Thank you for your continued cooperation and understanding! :)

Recent Posts
Archive
Follow Us
bottom of page